STANDARD STATIONS
1ª Position: Lees tray and centring system.
2ª Position: Hot or cold high pressure wash.
3ª Position: Draining module with tray for waste waters canalization.
OPTIONAL STATIONS AND EXTRAS
– Ramp with lees collection.
– Inner drying of the barrel by blowing air under pressure.
– Steaming of the barrel from 100º to 150ºC.
– Internal sulphite by injection of sulphurous gas.
– Interior washing of the barrel with ozonized water.
– Loading and unloading table with rack.
– Loading and unloading of barrels in support.
STANDARD EQUIPMENT
-Display and programmable PLC control.
– Electrical protection and emergency stop.
– Timer for all process tasks.
– Stainless steel arches and protection fences.
– Barrel loading, draining and unloading ramps.
– Motor pump unit for lifting and lowering the platform.
– Counter of treated barrels.
RECOMMENDED PRESSURE EQUIPMENT
– Power: 5.5 H.P.
– Minimum pressure: 100 bar.
– Minimum flow: 15 l./min.
– Three-phase voltage: 230/400 V. 50-60 Hz.
* Depending on the chosen options, more than one peripheral may be needed. Auxiliary equipment not included
* Suitable for 225-228-300 L barrels
| Power (H.P) | Depending on options |
| Dimensions (LxHxW) | 6330x2000x1350 |
| Weight (kg) | 360 |
| Three-phase voltage | 240/400V 50Hz III+N |
| Material | Stainless Steel AISI304 |
| Minimum Washing Time | 90» |
| Temperature Maximum water (ºC) | 60-90 |
| Impact pressure (bar) | 80-150 |
| Required flow rate (l/min) | Depending on connected equipment |
Contact us and we will answer all your questions: