Standard Stations:
1. Station: Automatic Centering XYZ
2. Station: Initial Rinsing
3. Station: High-pressure washing of multidirectional tube
4. Station: Vaporized axis with temperature control
5. Station: Low-pressure rinsing with ozone option
Optional and extra stations:
Ramp with turbidity collection.
Internal drying of the barrel by high-pressure air blowing.
Vaporization of the barrel from 100º to 150ºC.
Internal sulfitation by injection of sulfurous gas.
Interior washing of the barrel with ozonated water.
Loading and unloading table with rack.
Loading and unloading of barrels on support.
Automatic vertical loading and unloading
Standard equipment:
Display and control screen with programmable logic controller.
Electrical protections and emergency stop.
Timer for all process tasks.
Protection arches and fences in stainless steel.
Loading, draining, and unloading ramps for barrels.
Motobomb group for raising and lowering the platform.
Counter for treated barrels.
Recommended pressure equipment:
Power: 5.5 C.V.
Minimum pressure: 100 bar.
Minimum flow rate: 15 l./min.
Three-phase voltage: 230/400 V. 50-60 Hz.










Do you want information about this product?
Contact us, and we will answer all your questions.